Doing a short haul to clean the bottom and put on new zincs and I am winterizing this weekend. Also doing an oil change in the transmissions and motors and sending out samples of those and the genset for analysis. That gives me roughly three months to change out the waste lines, rebuild the vacu-flushes, clean and paint the new/found bilge or storage areas, line the cabinet where the washer dryer was with cedar, put in the wood floors, build new wood stairs, install some new lighting fixtures, install the new chartplotter, and repair the windlass. Then it is re-commission and start the new season in the Chesapeake.