- Joined
- Jul 12, 2007
- RO Number
- 27413
- Messages
- 1,164
I was finally able to get out to the marina in Eastpport to tape on the replacement shrinkwrap door and to start building the Kover Klamp and electrical pipe framework for a winter cover. The previous door had been ripped off by one of the January storms. I had taped the cutout back in place to keep the heavy snow and critters out of the boat. Everytime I tried to go to the marina since I bought the replacement door, we have had snow or bitter temperatures, which prevented the tape from sticking. The door's in. I brought out the boxes of Klamps and fittings and most of the electrical pipe I had used for the framework on our previous boat. I want to reuse as much of the pipe as I can. My plan is to build a minimal framework, getting the main arches and supports at the change-spots under the shrinkwrap. I'll then use the shrinkwrap in the spring or summer as a pattern to make a real winter cover out of Sunbrella or another similar fabric. Building the framework under an existing cover is not easy. I have to rebend the pipes to fit what's there instead of building it in open air and making a cover to fit. Shrinkwrap is fine, but I have a real problem with spending many hundreds of dollars on something which will be thrown away at the end of the winter.I figure I'll need about another 10-15 hours to build the framework. When it's all up, I'll shoot some photos and post them. Spring is in the air! Of course, tonight's temperature is supposed to be about 22 degrees, but the weekend is supposed to be in the 50s. There's hope. Hy