- Joined
- Jan 1, 2000
- RO Number
- 775
- Messages
- 1,226
Progress Energy has had Lake Tillery down this month to do floodgate repairs. Usually they drawdown every 5yrs, but they are going a year early. Getting a few repairs done on the dock - adding supports to SeaDoo lift, replacing a few pilings and adding some skirting around the dock. These pictures are before I have started any work. All the things that look like gravel on the lakebed are freshwater clam shells. It's like walking on a shell covered beach in some places. It is down about 10ft, they did a pretty good job of clearing Lake Tillery when it was built, in the deeper water they left the trees standing.