Question: When I tie lines in a transient slip, I prefer to place the eye on my boat cleat, loop once over their pilings, and secure the bastard end to the same or different cleat on my boat. I do this so I can adjust as needed and also when leaving I don't usually need any line handlers because I control both ends. This is a little more problematic when securing to a transient dock cleat. In that case, I secure the line to the slip cleat and then the bastard end to my boat cleat.
Any problems with this method? What do others do?
Any problems with this method? What do others do?