Wood Boat in and out of Boatyard

L. Keith

Active member
Member
Joined
Jan 1, 2000
RO Number
1615
Messages
2,397
I broke my normal rule and hauled at the end of Hurricane season this year. The railway was available and the tropical forecast was favorable, so we hauled in early October. Here are some photos that show the progress of work. We cleaned the hull top and bottom, prepped the steel, iron and copper on the bottom, removed and renewed the worm shoe (full length), sanded, prepped, primed and top coated the hull sides from the rubrail down, caulked a few bottom seams and tightened up a few butts, sanded the bottom and recoated with antifoul (Petit, this year), removed, cleaned, pressure checked, repaired and reset the main engine grid cooler, installed new anodes, cleaned prop and shaft. All in all not bad no surprises, weather cooperated with exception of a tropical storm/hurricane scare which turned out to be a non event.

Before








After pressure wash and cleaning.






Sanding and prep work underway.





Keel is sheathed in copper for extra protection against marine borers. It has worked great since 1947.



Grid Cooler awaiting resetting. This grid cooler was originally installed in a Higgins built LCVP (landing craft) built at the end of WWII. The Gray Marine 6-71, MG-165 marine reverse/reduction gear, grid cooler, bronze jumper shaft and tail shaft were all salvaged from the Higgins Boat for installation in the "Shamrock".



Primer Coat on!



Priming the rudder shoe, rudder and other underwater metal with Interlux 2000.



Anti Foul Topcoat is placed on the Interlux 2000 while still tacky. Anti foul stays on.



Top Coat almost complete.




Top Coat Complete, rub rails polished, getting close to completion.





Applying the name decal. This is the first time we have tried the decal approach. All the old sign painters (true skill) have gone on so the decal is our only real option. The sign company says 3 to 5 years, we will see.



Doesn't look bad.





Back in the water. I was too busy working to take photos during bottom painting.





Renewing starboard side hand rail, aft section, which was damaged during hurricane Katrina.



Toe rail where hand rail stanchion attach to deck. Lag bolt holes have been plugged waiting for new install.



Damaged rail, served us well for close to 53 years, you should have seen the Viking sport fish that feel down on us during Katrina. The Viking was total loss, we lost about 30' of handrail.



Pound Puppies prefer wood boats.

 
Cool looking boat! Lots of hard work put into that.........I admire you!
 
Glad to see that it worked out.
Prop looks awfully small behind all that deadwood??
 
Bruce we have a 1.5 to 1 reduction, so swinging a big diameter wheel will not do us any good. We make 8.5 Knots at 1,750 RPM and burn about 5 US gallons per hour, using N-55 injectors, we are at the peak of our performance chart.
 
Great reminder of my Wooden boat days. YOou list of the work done brought back all kinds of memories having done much of the same. I had almost forgotten about worm shoes; replaced on when I was 16 on Dad's 46' Lawley. Thanks for the trip on memory lane.
 
Here are some photos of the worm shoe renewal. Hardest part was jacking up the boat and moving the keel blocks.

Worm shoe is full dimension 2" X 12" X 20' treated pine. The repair required two lengths, total of 40'. We applied two coats of anti-foul, drilled pilot holes in the worm shoe stock for the nails.



Dry fitting the worm shoe.



We use roofing tar (worms hate it) as bedding compound between the worm shoe and the keel.







Roofing felt goes between the tar on the worm shoe and the tar on the keel.



Ready to drive the nails.



Driving the nail. I'm good for about four or five nails before I have to stop for breather.



Worm shoe nailed in place, now we just have to move all the keel blocks back into position.

 
Love seeing pics of your boat. Beauty.
 
Back
Top