Wantagh Pkwy 3rd Bridge

I was trying to find a completion date or a status.....

I found squat.....
 
YEs.... everthing is still there....

The road deck looks very far along.... But they still have all the Temp pilings in place and scaffolds...

WTF... there not working under the bridge anymore... pull that stuff..

Rob
 
Ride2008-3-10003.jpg


The Wantagh 3 last week.
 
LOOKIES NICE...... Anyone know what the clearence will be at high tide ? Why since starting from scatch they didnt make it very high is beyond me ... Maybe they'll make # 2 HIGHER??

Rob
 
as a reference point.

Verrazzano bridge:
Construction on the bridge started on August 13, 1959 and the upper deck was opened on November 21, 1964.
- Due to the height of the towers (690 ft) and their distance apart (4260 ft), the curvature of the earth's surface had to be taken into account when designing the bridge -- the towers are 1+5#8260;8 inches farther apart at their tops than at their bases.[3]
- Due to thermal expansion/contraction of steel, the bridge roadway is 12 feet lower in summer than its winter elevation

wantagh 3:
construction started, oh i don't even remember. somewhere around 10 years ago (their first swing at it)
- it seems to be a very complicated design, around 300' maybe.
- some guy is going to retire having only worked on that bridge.
 
LOL,,,,, true true ... They blamed the current ... apparently they build bridges only where there is slack tide.....

Also there Members of DONS union.... u know pay me ... give me ... and maybe we will work today ... Alittle bit....

Rob
 
NO.........Pay me......give me.....don't bother me ....and maybe we will work next week !
 